TrustMark Consultation 2026

Independent Inspection and Monitoring

An inspection is only as reliable as its competence, independence and evidence

When a homeowner reports dampness, cold walls, mould, unexplained heat loss or suspected insulation failure, an appropriate investigation is essential.

The inspection must identify what is actually happening within the building, not merely produce a predetermined outcome.

OSCAR considers independent technical assessment one of the foundations of meaningful consumer protection.

The problem with conflicting interests

A contractor who may benefit financially from carrying out extraction or replacement work should not automatically be the sole authority determining whether that work is necessary.

Similarly, a contractor defending an earlier installation should not be the only party whose technical assessment determines whether a complaint is rejected.

Neither circumstance proves wrongdoing, but both can create potential conflicts of interest.

OSCAR believes there should be a clear separation between:

  1. Technical diagnosis.
  2. Decisions about responsibility and funding.
  3. Remedial works.
  4. Independent verification of the completed remedy.

What a proper cavity wall inspection should establish

A standardised Cavity Insulation Condition Survey should record relevant information about:

Inspection techniques may include visual assessment, borescope examination, appropriate moisture investigation, thermal imaging where conditions permit and targeted opening-up where justified and authorised.

No single instrument or photograph should be treated as conclusive in every case.

A practical example of conflicting findings

OSCAR has encountered circumstances where an earlier assessment reportedly concluded that insulation was correctly installed, while a subsequent OSCAR inspection identified significant voids in areas examined.

Such differences require transparent evidence and an independent route to technical review.

They should not be resolved merely by accepting the opinion of whichever organisation has greater authority within a claims process.

Any published case study must accurately distinguish the findings OSCAR directly observed from the contents of reports supplied by others.

Technical monitoring throughout the work

Monitoring should not be limited to a final certificate.

The evidence should follow the work through its entire lifecycle:

Before

Condition, suitability, access, specification and initial evidence.

During

Operative identification, work undertaken, materials, methods, photographs and identified problems.

After

Completion records, relevant tests, outstanding limitations and independent verification.

For extraction work, records should establish what areas were treated, what was removed, whether obstructions remain and what evidence supports the clearance decision.

OSCAR’s proposed improvements

  • Standardised independent inspection procedures.
  • Measure-specific technical competence.
  • Clear identification of inspection limitations.
  • Independently reviewable photographic and technical records.
  • Transparent arrangements for resolving conflicting expert findings.
  • Separation of diagnostic and remedial financial interests.
  • Risk-based monitoring rather than paperwork-only auditing.
  • A meaningful route for consumers to challenge technically disputed decisions.

A complaint should be determined by reliable evidence, not by the commercial interests or institutional status of the organisation producing the report.

Explore OSCAR’s TrustMark Consultation Response

This subject forms part of OSCAR Onsite Ltd’s wider response to the TrustMark consultation on strengthening consumer protection.